Friday, 9 July 2010

Project Management Books

Project Management Books is a Guide to Success


A project books is somewhat better known as project management books. This is a collection of instructions on how to properly manage people in the work place that are part of your team. Knowing how to get the most of your team with the talents they already posses are the key to being a good manager. This includes what motivates them and what discourages them.

The project management books that is followed can make the difference in the outcome of the project, if it is followed correctly. When looking at the different ones available, peek into the table of content to see what is really in it.

There should be a section on:

  • people management,
  • managing time,
  • financial
  • and budget management.
 
Other issues that should be covered are communications, risks, issues, problem solving, reports, and how to properly structure a project from beginning to end.






There should be, within project management books, a section on what is basic on managing a project. This would be best covered if there is a step-by-step approach to planning, scheduling, and executing of a project. There should also be ideas on how to properly track the progress of the project at every stage along the way.

Additionally, the project management books should also contain a section on more advanced and complex issues. This should include how and what should be reported during and at the conclusion of a project. Knowing what should be reported and to whom, can make the difference whether you will be given another project, as a project manager, in the future.

The difference between a project management books that helps to guide and one that can really give a manager the edge is when a section on “value to the customer” is present. Knowing how to spot what adds value to a product for a customer can help significantly on improving a revenue stream. The more value a product has to a client, the greater the price it can be sold for to them, immaterial on how much it cost to manufacture a product. This is called price to value. The value a customer receives is how it is priced. This is especially advantageous to a business when they have a unique product or a monopoly on a sector of business.

This is what to look for when examining a project management books for use by yourself or your project managers to learn from.


Project Management Books

Examples of project management books available for lowest cost.

10 Tips for Project Success

Want to improve your project success? In this post we'll tell you how, by listing our Top 10 tips. So here they are...
10 Tips for Project Success

  1. Starting out: Make sure that when you start out your customer defines their requirements in depth. You need to know exactly what it is that must be delivered, to who and when. Make it specific, write it up formally and get them to sign it off. This document will become the basis upon which to measure your success.
  2. Customers: Involve your customers throughout the entire project life cycle. Get them involved in the analysis and planning, as well as execution. You don't have to seek their approval, just keep them informed. The more you involve them, the greater their level of buy-in and the easier it is to manage their expectations.
  3. Timeframes: Keep your delivery timeframes short and realistic. Never agree to lengthy timeframes. Split the project into “mini-projects” if you need to. Keep each mini-project to less than 6 months. This keeps everyone motivated and focused.
  4. Milestones: Break your project timeframe into "Milestones" which are manageable pieces of work. Add delivery deadlines to your milestones and try to deliver on every deadline, no matter what. If you're late, tell your customer about it as early as possible.
  5. Communications: Make sure you keep everyone informed by providing the right information at the right time. Produce Weekly Status Reports and run regular team meetings. Use these Project Management Templates to save you time.
  6. Scope: Only authorize changes to your project scope if there is no impact on the timeline. Get your customers approval to important scope changes first and then get their buy-in to extend the delivery dates if you need to.
  7. Quality: Keep the quality of your deliverables as high as possible. Constantly review quality and never let it slip. Implement “peer reviews” so that team members can review each others deliverables. Then put in place external reviews to ensure that the quality of the solution meets your customer's needs.
  8. Issues: Jump on risks and issues as soon as they are identified. Prioritize and resolve them before they impact on your project. Take pride in keeping risks and issues to a minimum.
  9. Deliverables: As each deliverable is complete, hand it formally over to your customer. Get them to sign an Acceptance Form to say that it meets their expectations. Only then can you mark each deliverable off as 100% complete.
  10. Your team: Great projects are run by great teams. Hire the best people you can afford. Spend the time to find the right people. It will save you time down the track. Remember, good people are easy to motivate. Show them the vision and how they can make it happen. Trust and believe in them. Make them feel valued. They will work wonders.
And that's it. With these 10 tips you can boost your project success. And here's one last tip that will save you time and effort - use Project Management Templates to produce deliverables faster and easier than before. Download the Project Management Kit of templates today.



10 Tips for Boosting Team Performance
10 Tips for Boosting Team Performance.There are lots of different ways that you can boost your team performance. We’ve listed here our Top 10 Tips. We hope they help you… 

Tuesday, 6 July 2010

The Project Management Template – Guiding the Way to a Successful Project

Using a project management template not only saves time, money, and effort; it also ensures that all aspects and phases of a project are included in the project plan.

A good template includes the following:
  • Defining Project Responsibilities
  • Stakeholder Analysis
  • Milestone Chart
  • Milestone Report
  • Variation Form
  • Risk Log
  • Business Case Form
  • Project Definition Form or PID
  • Project Reporting Form
  • Highlight Report
  • Change Control Form
  • Change Control Log
  • Actual Vs Planned
  • Project management check sheet

    Defining project responsibilities identifies two aspects of project management: tasks and team members.
    A Business Case is a documented, structured proposal for business improvement.  It is prepared to facilitate a selection decision for a proposed project.  The Business Case:

    • Illustrates reasons and justification in terms of business process performance, needs and-or problems, and expected benefits.
    • Identifies the high-level requirements that are to be satisfied
    • Provides analysis of proposed alternative solutions (with reasons for rejecting or carrying forward each option)
    • Includes assumptions and constraints
    • Details risk-adjusted cost-benefit analysis
    • And has a preliminary acquisition plan.

    It may seem like a daunting task to create a business case, but it doesn’t have to be an issue when using business case templates.  One of the best ways to evaluate the viability of a business model or to demonstrate the potential of your proposed business solution is to write a business case.


    Business case templates take the stress out of developing a business case and are available pre-formatted for many industries and for grant proposals/applications.  Whether using a paid template or a free one, they help a project manager produce a well-organized and compelling business case.


    Just as projects vary, templates are not “one size fits all.”  It is up to the project manager to identify the right business case template for the individual project.  There are internal and external, corporate and not-for-profit business cases.


    If providing business cases is a common occurrence it makes sense to develop a customized template.  A standard format for business case templates:

    • Title
    • Table of Contents
    • Executive or Project Summary
    • Mission Statement
    • Objectives
    • Needs Assessment
    • Technical Analysis
    • Project Work Plan
    • Financial Plan
    • Appendix

    Typically, the Title, Table of Contents, Mission Statement, and Summary are added to the business case after the other sections are completed.  The information from the Objectives, Needs Assessment, Technical Analysis, Project Work Plan, and Financial Plan will help determine what goes into the other sections.
    By developing a business case template, a project manager has full control over the layout and information, as well as the presentation of the case.


    The Title, Table of Contents, and Mission Statement are one page each.  The Summary should not be longer than two pages; ideally, one page.


    The other sections require detail and documentation, and so will generally be at least two pages each.
    Using one or more business case templates can be of good use to the project manager, providing examples and guidance to ensure the manager’s final template is both easily to use and professional looking.


    Developing business case templates means absolute control over the case document, with no need to modify or remove information that is not applicable to the project.


    A customized business case template eliminates unneeded sections or text, making it easy for a project manager to utilize over and over again.


    Other articles on Project Management Templates:

    Project Management Templates and Their Benefits 
    Project Management templates are an excellent tool for any project, large or small.  They reduce the time necessary for documentation, and can ensure no steps of the project are neglected.

    10 Tips for Boosting Team Performance
    10 Tips for Boosting Team Performance.There are lots of different ways that you can boost your team performance. We’ve listed here our Top 10 Tips. We hope they help you…

    Managing Project Management Template Risks
    If all of our projects just smoothly followed our project schedule we’d have it made.  No issues, no budget overruns, no cranky customers, no scope changes.  But that’s not the case. 

    Why Project Management Templates are an Essential Tool for Project Managers
    The reason why project management templates are an essential tool for project managers is simple. 

    Why Project Management Templates Are Useful
    Knowing why project management templates are useful when carrying out large projects is the first step to a smoothly-running project.

    Friday, 25 June 2010

    How to Create Your Project Dashboard

    As a Project Manager, you have to know whether you're ahead or behind target, every day. To do this, learn...
    How to Create Your Project Dashboard

    A "Project Dashboard" is a tool that provides you with a graphical view of the progress of your project, so that you can see at a glance whether you're on track. It's basically a set of Charts that gives you the current status of the project at any time. You can create the Charts manually in Excel, or use smart software that does it for you.
    To create your own Project Dashboard in Excel, take these steps:



    Step 1: Get a Pen and Paper
    Sit down with a pen and paper and list the things that determine whether your project will be a success. It might be that your project is delivered on time and under budget. Or that tasks are completed when expected and that your resources are perfectly allocated. It's these types of things that your project dashboard needs to track, every day.
    Step 2: Gather your Data
    Then collate all of the data that is needed to measure the success criteria you've defined above. The data may exist in Project Plans, Excel spreadsheets or Word documents. It might exist also in Timesheets, Expense Forms and risk / issue / change logs. Remember, the quality of your project dashboard depends on the quality of the data that goes into it.
    Step 3: Sift, Sort and File
    You then need to sift through your data, sort it into groups and file it all in one place, so that you have the right information needed, to populate your dashboard.
    Step 4: Create your Dashboard
    You're now ready to build your project dashboard. Enter all of your data into a single spreadsheet and create the following charts to create your Project Dashboard:
    • Time Chart: This chart tells you whether you're on schedule. You need to list your tasks and identify the planned versus actual percent complete for each task. Summarize this data and you'll find out whether you're ahead or behind schedule.
    • Cost Chart: To find out if you're under or over budget, you need to add up all of your project costs and compare them to your budget. To do this, calculate the cost of your resources, as well as equipment, materials and any expense forms completed by staff.
    • Tasks: You need to know the percentage of tasks that have been completed to date, so that you can get a feel for how much of the project has been done. List all of your tasks and identify whether they have been "Not Started", are "In Progress" or "Complete".
    • Resource: It's important to know whether your resources are over-worked. To calculate this, list all of your resources and work out how many calendar days they have scheduled for the project. Then identify from your task list, how many days they have been assigned to tasks. If they have been assigned to tasks for more days than they have available in their calendar, then they are "over-resourced" and you need to reduce their workload.
    • Risks: Every project involves risks, issues and changes. Make sure these are documented and identify whether each is low, medium or high impact. Then sum them up to find out how "at risk" your project is.
    Step 5: Review it Daily
    A fully populated project dashboard will tell you at a moments glance, whether you're on track. You need to populate your dashboard each and every day, to have the best chance of success.

    Wednesday, 9 June 2010

    Key Project Manager Practices

    Managing a project can be daunting, but using the right techniques and tools will help the project manager achieve a project no matter how complex or large it might be.  There are seven practices that any project manager can put to good use to ensure the success of the project.

    Define the objectives, scope and stakeholders
    Firstly, understand the project objectives. Deciding the real objectives will help plan the project.  The client may have many ideas, but often it turns out that most of those ideas are not applicable to the current project.
    Scope is the boundaries of the project.  Deciding what’s in or out of scope will determine the amount of work which needs performing.

    Determine the stakeholders, what they expect to be delivered and enlist their support.  The stakeholders will review the objectives and scope, and either agree with them, or indicate what needs to be changed before they can give their approval.

    Define the deliverables
    Define what will be delivered by the project.  Decide what things, whether product or service, will be delivered.  Document them in enough detail to enable someone else to produce them correctly and effectively.
    Key stakeholders must review the definition of deliverables and must agree they accurately reflect what must be delivered.

    Project planning
    Define what activities are required to produce the deliverables using techniques such as Work Breakdown Structures. Estimate the time and effort required for each activity, dependencies between activities and decide a realistic schedule to complete them. Involve the project team in estimating how long activities will take. Set milestones which indicate critical dates during the project. Write this into the project plan. Get the key stakeholders to review and agree to the plan.

    Communication
    Project plans are useless unless they’ve been communicated effectively to the project team. Every team member needs to know their responsibilities. I once worked on a project where the project manager sat in his office surrounded by huge paper schedules. The problem was, nobody on his team knew what the tasks and milestones were because he hadn’t shared the plan with them. The project hit all kinds of problems with people doing activities which they deemed important rather than doing the activities assigned by the project manager.

    Tracking and reporting project progress
    Once your project is underway you must monitor and compare the actual progress with the planned progress. You will need progress reports from project team members. You should record variations between the actual and planned cost, schedule and scope. You should report variations to your manager and key stakeholders and take corrective actions if variations get too large.

    Change management
    By managing changes, the project manager can make decisions about whether or not to incorporate the changes immediately or in the future, or to reject them. This increases the chances of project success because the project manager controls how the changes are incorporated, can allocate resources accordingly and can plan when and how the changes are made. Not managing changes effectively is often a reason why projects fail.

    Risk management
    Risks are events which can adversely affect the successful outcome of the project.  Risks will vary for each project but the main risks to a project must be identified as soon as possible. Plans must be made to avoid the risk, or, if the risk cannot be avoided, to mitigate the risk to lessen its impact if it occurs. This is known as risk management. Not managing risks effectively is a common reason why projects fail. Download these  Project Risk Management Templates to reduce risk on projects. View the sample risk management templates in PDF - Project Risk Management templates

    Project Management Templates and Their Benefits

    Project Management templates are an excellent tool for any project, large or small. They reduce the time necessary for documentation, and can ensure no steps of the project are neglected.
    Project Initiating Process Group Templates

    Project Charter Template: The Project Charter is developed during the initiation phase to formally authorize a project. The Project Charter is required before any work on the project can begin.

    • Paragraph 1: Formally authorizes the project.
    • Paragraph 2: Project Scope – Its deliverable, and what business needs, problems or opportunities the project addresses.
    • Paragraph 3: Identify the Project Manager and give him authority to apply organization resources to the project
    • Paragraph 4: Provide the summary milestone schedule
    • Paragraph 5: Project Budget – state the budget for the project and identify funding sources


    Preliminary Project Scope Statement: The Preliminary Project Scope Statement is created after the Project Charter has been signed. This Statement is completed during the Initiation Phase to ensure the successful planning of the project.


    Project Planning Process Group Templates

    Communications Management Plan Template: defines the communication requirements for the project and how the information is to be distributed.

    Cost Management Plan Template: details how the project costs will be measured and reported upon. It indicates the control thresholds and the corrective actions to be taken if the thresholds are exceeded.

    Procurement Management Plan Template: identifies the processes for evaluation, selection and management of procurements required for a project.

    Scope Management Plan Template: ensures that the project includes the work and only the work necessary to successfully complete the project.

    Project Management Plan Template: states how the project is executed, monitored and controlled and closed. These documents feed into the development of the project management plan.

    Risk Register Template: a list of all project risks including their risk rankings, responses and risk owners.



    Project Executing Process Group Templates


    Expense Report Template: is designed for both domestic travel and International travel (a tab for each at the bottom of the spreadsheet).

    Employee Annual Review Template: for conducting performance reviews. Useful as an annual review or as a tool for the Project Manager to perform an employee review.


    Project Monitoring and Controlling Process Group Templates

    Project Status Report

    Project Change Request

    Project Performance Report


    Project Closing Process Group Templates

    This document establishes formal acceptance of all the deliverables for the project.



    Project Document Templates

    Project Meeting Agenda Template: key to presenting a well planned and well executed meeting.

    Project Meeting Minutes Template: clearly documents the discussion topics of the meeting, any decisions which were made and assigns new action items to individuals. Promptly distributing clearly written project meeting minutes is important to success in project management.


    With so many project management templates available, it is easy for the project manager to find those that are the most applicable and useful for the project. The initial time investment that a project manager makes in finding the right templates will save time during the project itself.


    Other articles on Project Management Templates:

    The Project Management Template – Guiding the Way to a Successful Project
    Using a project management template not only saves time, money, and effort; it also ensures that all aspects and phases of a project are included in the project plan.

    10 Tips for Boosting Team Performance
    10 Tips for Boosting Team Performance.There are lots of different ways that you can boost your team performance. We’ve listed here our Top 10 Tips. We hope they help you…

    Managing Project Management Template Risks
    If all of our projects just smoothly followed our project schedule we’d have it made.  No issues, no budget overruns, no cranky customers, no scope changes.  But that’s not the case. 

    Why Project Management Templates are an Essential Tool for Project Managers
    The reason why project management templates are an essential tool for project managers is simple.

    Why Project Management Templates Are Useful
    Knowing why project management templates are useful when carrying out large projects is the first step to a smoothly-running project.

    Monday, 7 June 2010

    10 Tips for Boosting Team Performance


    As a Project Manager, your success depends on how well your team performs. So if you want to improve your team performance, then read these:

    10 Tips for Boosting Team Performance
    There are lots of different ways that you can boost your team performance. We’ve listed here our Top 10 Tips. We hope they help you…

    Tip 1: Show them the vision
    People only perform well in a role if they understand what it is that they need to deliver and why. For this reason, we suggest you get your team together to reinforce the project vision, objectives, timeframes and deadlines. Make your team feel wanted and needed by showing them that the project is critical to the success of the business. You will gain their buy-in and their commitment going forward.
    Also, use these Project Management Templates

    Tip 2: Meet them individually
    After your meeting, take each team member aside and tell them what it is that you need from them to help you deliver the project. Make sure they have a clear Job Description and they know how you are going to measure their performance. Ask them how they like to be managed, what motivates them and how you can support them in their role.

    Tip 3: Give them room
    At this point, you need to back off a little and give them room to perform. And if the pressure increases in your project, you need to give them more room than less. It’s hard to do this, but you mustn’t over-pressurize them or their performance will reduce, rather than improve.

    Tip 4: Count the goals
    As you back off, you need to put in place checks to measure their performance regularly. Meet with them individually every month to discuss their achievements, what’s outstanding and how they can improve. Make sure you don’t “bottle up” your concerns. Instead speak to them openly, keeping constructive at all times.

    Tip 5: Be positive
    If you’re stressed and weary, ease off on your staff. Shouting or being negative will only rub off on them. It’s incredibly difficult but you need to be positive, reassuring and supporting them at all times, even if the project is delayed.

    Tip 6: Shake hands and pat backs
    It’s easy to forget to praise your team’s successes. So every time you deliver a great quality product, finish a difficult task on time or get great feedback from a customer—congratulate those responsible in your team.
    Also, use Project Scheduling Software

    Tip 7: Meet at half time
    Get your team together regularly to build a strong team spirit. Get them socializing together, so that new friendships are formed. The stronger the bond your team have with each other, the more likely they will work together as a single cohesive unit and achieve the objectives you have set.

    Tips 8: Take time out
    Don’t be afraid to give team members time off for working hard. By taking time out, it will reduce sick leave, improve motivation and increase efficiency.

    Tips 9: Give them what they need
    Everyone is motivated by different things. You need to know what motivates every different member of your team. Get to know them well. If you can reward each person differently based on their motivations, then you’ll improve their performance every time. This is the hardest trick in the book, but the one that pays the biggest dividends.

    Tip 10: Celebrate your wins!
    Staff all too often finish a project and move straight onto the next one without celebrating its success. When they do this, they carry their stress and pressure into the next project they work on. So help your team to “start afresh” by celebrating your success at the end of the project.
    By taking these 10 tips seriously, you will improve the performance of your team and boost your chances of success.


    Other articles on Project Management Templates:

    Project Management Templates and Their Benefits 
    Project Management templates are an excellent tool for any project, large or small.  They reduce the time necessary for documentation, and can ensure no steps of the project are neglected.

    The Project Management Template – Guiding the Way to a Successful Project
    Using a project management template not only saves time, money, and effort; it also ensures that all aspects and phases of a project are included in the project plan.

    Managing Project Management Template Risks
    If all of our projects just smoothly followed our project schedule we’d have it made.  No issues, no budget overruns, no cranky customers, no scope changes.  But that’s not the case. 

    Why Project Management Templates are an Essential Tool for Project Managers
    The reason why project management templates are an essential tool for project managers is simple. 

    Why Project Management Templates Are Useful
    Knowing why project management templates are useful when carrying out large projects is the first step to a smoothly-running project.

    Sunday, 6 June 2010

    Managing Project Management Template Risks


    If all of our projects just smoothly followed our project schedule we’d have it made.


    No issues, 

    No budget overruns, 

    No cranky customers, 

    No scope changes.  

    But that’s not the case... 



    There are always going be some issues, the budget never manages itself, the customer always has a few demands, and scope is usually a challenge to manage and keep in check.

    What I haven’t touched on yet is project risk.  What is risk in terms of project management templates?  One definition goes like this…

    “A possible event that could endanger the planned course or goals of the project.”

    Do we need to manage for these risks, these ‘possible’ events that may or may not happen?  Or can we just leave things to chance and worry about them if and when they happen?  You can, but the impact may be so great and blindside you so badly that the project can get knocked way off course or could come to a complete halt.

    As part of a sound and solid project management process, it is far better to plan for risk and look for ways to avoid a specific risk even happening or ways to work through an risk event should it actually happen.  Basically, every company with a formalized project management methodology should have a risk management component.

    Risk items are likely to come up on nearly every project you manage.  Training yourself to recognize potential risks as they arise is a critical piece of your overall project management process and something you and your project team need to work very hard with the customer to do well.

    Sometimes you have to think out-of-the box – think in terms of what-if scenarios.  And as you identify potential risks associated with tasks and milestones in your project plan, document them and revisit them every week with your team and your customer.  Above all, be proactive.  Approaching risks in this manner will help you to better recognize the event should it occur and be much better prepared to deal with it.  And in the long run that means your project has a far greater chance for success.


    Other articles on Project Management Templates:

    Project Management Templates and Their Benefits 
    Project Management templates are an excellent tool for any project, large or small.  They reduce the time necessary for documentation, and can ensure no steps of the project are neglected.

    The Project Management Template – Guiding the Way to a Successful Project
    Using a project management template not only saves time, money, and effort; it also ensures that all aspects and phases of a project are included in the project plan.

    10 Tips for Boosting Team Performance
    10 Tips for Boosting Team Performance.There are lots of different ways that you can boost your team performance. We’ve listed here our Top 10 Tips. We hope they help you…  

    Why Project Management Templates are an Essential Tool for Project Managers
    The reason why project management templates are an essential tool for project managers is simple. 

    Why Project Management Templates Are Useful
    Knowing why project management templates are useful when carrying out large projects is the first step to a smoothly-running project. 

    Saturday, 5 June 2010

    Why Project Management Templates are an Essential Tool for Project Managers


    The reason why project management templates are an essential tool for project managers is simple.  Using a template saves time and ensures uniformity of documentation.  Of all the tools available to project manager, templates are likely the most important and essential tool for project managers.

    Tools are the means that help managers and the team members successfully plan, manage and execute the different tasks involved in each project.  The best project management tools are not very sophisticated. They include primarily templates, check-lists (milestone reviews) and planning software.

    Given the wide range of project management tools available, the keys to selecting the right ones are understanding that different tools are needed along the different stages of a project life cycle, and knowing why project management templates are an essential tool for project managers.

    During all phases of the project, Milestones Reviews and Business Plans take a leading role.  In the Initiation phase, the Project Charter, Business Plan, Project Framework (or Overview), and Business Case Justification are essential.  In the Execution and Control phases, an update of Risk Analysis and Score Cards prevail. During Closure, no special tool is needed.

    Project Templates are available for:

    • Business Plan
    • Milestones Check-list Scheduling Tools and Methodologies:
    • Gantt
    • Pert
    • MS Project
    • Business Case Justification
    • Project Charter
    • Project Framework or Overview
    • Risk Analysis
    • Score Cards
    • Team Building
    • Project Communication Plan
    • Project Management Templates
    • Project Management Software Packages

    The above list is only a small sample of the tools and templates a good project leader uses.
    Templates can be used in almost every phase of a project.  From the initial brainstorming stage to the successful closure of the project, templates simplify the management of the process.
    Using templates can help the project manager with:
    • Communicating the requirements of the customers to the project team without any ambiguity.
    • Discussion on the requirements gathered and acceptance of the goals that must be achieved to satisfy the customer.
    • Documenting the scope and feasibility of the job.
    • If the plan is a worthwhile venture, it is documented. A part of the document goes to all the stakeholders to understand the scope of the project.
    • Defining the project scope and goals
    • Division of the plan into tasks and sub tasks
    • Drawing up a project schedule to allocate work for each person and the deadlines for each of the tasks
    • Determining if the cost predictions are comparable with the actual cost incurred
    • Determining the effectiveness of the job, which can be measured by earned value or activity float statistics
    • Identifying areas of potential concern to the plan; the findings along with the solutions are added to the reports
    • Adjusting and modifying the plans and schedules to overcome the problems that exist and those that are forecasted
    • Completing the documentations that were maintained throughout the assignment
    Successful project managers know that templates are not just time-saving.  Templates provide a uniformity to the project’s documentation.

    Understanding why project management templates are an essential tool for project managers is a first step toward a successfully completed project.


    Other articles on Project Management Templates:

    Project Management Templates and Their Benefits 
    Project Management templates are an excellent tool for any project, large or small.  They reduce the time necessary for documentation, and can ensure no steps of the project are neglected.

    The Project Management Template – Guiding the Way to a Successful Project
    Using a project management template not only saves time, money, and effort; it also ensures that all aspects and phases of a project are included in the project plan.

    10 Tips for Project Management Templates
    10 Tips for Boosting Team Performance.There are lots of different ways that you can boost your team performance. We’ve listed here our Top 10 Tips. We hope they help you…  

    Managing Project Management Template Risks
    If all of our projects just smoothly followed our project schedule we’d have it made.  No issues, no budget overruns, no cranky customers, no scope changes.  But that’s not the case. 
     
    Why Project Management Templates Are Useful
    Knowing why project management templates are useful when carrying out large projects is the first step to a smoothly-running project.  

    Why Project Management Templates Are Useful


    Knowing why project management templates are useful when carrying out large projects is the first step to a smoothly-running project.  There are numerous templates available for different project management tools, like Gantt Charts or Risk Analysis, and a manager should take advantage of any template solution found to be applicable to the project.  Templates can save time and money and help the manager avoid mistakes.  A good template is adaptable to a specific project and future ones as well.

    Save Time
    Why project management templates are useful when carrying out large projects is because of the time saved in developing a project plan from scratch.  There is no reason for a project manager to redo work that is already done, and simply needs to be filled in on a template.
    Although it might take some time to find the right template or templates, once they are found the investment of time is a once and only investment.  A project manager will see the value added to the management process.  Instead of being caught up in the paperwork and planning, a manager can simply fill in forms as needed and focus on getting the project delivered

    Save Money
    By saving time, the project manager learns why project management templates are useful when carrying out large projects: they also save money.  Many templates can be found for free or no cost online.  By reviewing a few of them side-by-side, the project manager can select the best template for the current project.  This method avoids the high prices associated with outside consultants developing the documentation a project needs to run smoothly.
    Developing a large project of course does not mean unlimited funding.  So by using free project management templates little or no money is needed to begin the documentation process for the project.

    Avoid Mistakes
    When using a project template, most of the hard work of trial and error has already been done: done by the template creator and also other project managers that used it.  A template typically follows a point-by-point method, allowing the manager an overview of the entire project process.
    Following a template when planning a large project eliminates much of the guess-work and forgotten steps or tools.  A project manager working on a large project can see where mistakes or skipped steps or tools might occur.  This allows adjusting the plan accordingly before the active phase of the project begins.

    Adaptability
    A good template that can easily be altered for the type or size of the project is another reason why project management templates are useful when carrying out large projects.  There is not one-size-fits-all template, but a project manager can customize the template or templates to suit the project and ensure they have all the steps and tools needed to complete the project on time and under budget.

    Conclusion
    Understanding why project management templates are useful when carrying out large projects helps the project manager maintain the scope and complexities demanded by large projects.


    Other articles on Project Management Templates:

    The Project Management Template – Guiding the Way to a Successful Project
    Using a project management template not only saves time, money, and effort; it also ensures that all aspects and phases of a project are included in the project plan.

    10 Tips for Project Management Templates
    10 Tips for Boosting Team Performance.There are lots of different ways that you can boost your team performance. We’ve listed here our Top 10 Tips. We hope they help you…

    Managing Project Management Template Risks
    If all of our projects just smoothly followed our project schedule we’d have it made.  No issues, no budget overruns, no cranky customers, no scope changes.  But that’s not the case. 

    Why Project Management Templates are an Essential Tool for Project Managers
    The reason why project management templates are an essential tool for project managers is simple.

    Project Management Templates and Their Benefits 
    Project Management templates are an excellent tool for any project, large or small.  They reduce the time necessary for documentation, and can ensure no steps of the project are neglected. 

    Essential Project Management Tools

    4 Essential Project Management Tools

    Project Managers have four essential tools to help them bring a project from start to finish, on time and within budget.  Without these tools in place and effective use, a project will most likely fail in delivery and client satisfaction.
    Specifically, the tools addressed in this article are:
    • The budget;
    • Work breakdown structure;
    • Network diagram;
    • Risk management plan.
    Effective use of these project management tools is the core of a successful project.  When put into use, they can help the Project Manager and support team stay on track and deliver the objective as required.

    1. The Budget.
    The budget is the project management tool that will be used the most throughout the life cycle of the project.  The Project Manager begins by allocating resources and assigns tasks within the budget allowance.  During the execution of the project plan, it is not unusual for the Project Manager to make adjustments to keep the project within the budget parameters.
    For small or simple projects, spreadsheet software is enough to create budgets and reports.  There are templates available to save time and effort.  However, for larger or more complicated projects, a better software solution is needed.  There are online programs to fit any size project and any number of shareholders.

    2. The Work Breakdown Structure (WBS).
    A hierarchical structure, the WBS breaks down the project into tasks and sets the duration of those tasks.  This project management tool enables the Project Manager to identify independent tasks, allocate the needed resources for each task, and assign them to the appropriate stakeholder.
    The WBS is often represented in such forms as diagrams, tables, or outlines.  These can, like the budget, be created using spreadsheet software or the programs dedicated to project management.

    3. The Network Diagram.
    The network diagram is the project management tool that picks up where the WBS leaves off.  This diagram provides a graphical view of task dependencies and sequence; this tool can identify those tasks that can be done at the same time by different support personnel.
    There are both desktop and online software solutions that can render the Network Diagram into a flow chart that shows in greater detail the information provided by the WBS.

    4. The Risk Management Plan.
    This project management tool is a system used by Project Managers to identify, assess, and respond to project risks: project management risks, resource risks, client risks, technical risks, and other risks appropriate to the specific project.

    Like the other tools, basic office productivity software (spreadsheet, word processor, etc.) can be utilized for the  Risk Management Plan, especially if the project is of small scale or simple scope.  Online software solutions can help with projects that are too complicated for a productivity suite.
    In conclusion, these Project Management tools help to ensure the Project Manager can deliver a successful project objective.  Whether manual methods or sophisticated software are used, utilizing the four essential tools will help keep the project on track.

    Project Management Life Cycle

    Any project you are preparing will proceed more smoothly and with greater effect by understanding and utilizing the Project Management Life Cycle.  It will assist you in narrowing the focus, keeping objectives in order, and of course bring the project to completion on time and under budget.

    The life cycle of a project progresses though five steps, which are Initiation, Planning, Execution, Monitoring/Control and Closure. There isn’t a single step that is more important that any other, and each step is critical to the successful completion of the project.

    The first step is Initiation. It provides the over-view of the project and how it will be successfully achieved.  The most common tools or methodologies used are Project Review, Plan, Overview and Schedule Reviews.  The new project starts by defining its objectives, scope, purpose and list of deliverables to be produced.  During this initial phase the project manager will be appointed, and he will select his team members according to their experience and skills.

    Planning is the second step in the project management life cycle.  The plan must include certain elements, such as a breakdown that is detailed into tasks and the assignment of each task to members of the project team, from start to finish.  There must also be set criteria for defining successful completion of each task.  Typically a risk assessment is included in the Planning step as well.
    This phase involves creating of a set of plans to help guide your team through the execution and closure of the project.  The plans created will help manage time, cost, quality, change orders or variation, risk factors and other issues. They will also help you to manage key personnel and external vendors/suppliers, to ensure that you deliver the project on time and within budget.

    Execution and Control are the third and fourth steps in the project management life cycle.  These phases tend to be grouped together because each step of execution is measured against the control standard of the project.  The solution for the project’s purpose (usually solving an existing problem) is implemented.  As these steps progress, stakeholders become more involved in the planning for the final step.

    The Project Execution is usually the longest phase in the project life cycle and it typically consumes the most energy and the most resources.  The most important issue in this part is to ensure activities are properly executed and controlled. You will need to implement a range of management processes during this phase. These processes help you to manage procurement, client approvals and communications.
    The most common tools or methodologies used in the execution phase are an update of Risk Analysis Review, in addition to Project/Business Plan. The planned solution is implemented/incorporated to solve the problem specified in the business requirements.

    Closure is the natural end to any cycle, and the project management cycle is no different.  A formal written project review report is developed, containing these elements: the formal acceptance by the client of the result of the project; a comparison of the initial requirements against the delivered product; lessons learned; project resources; and the formal project closure notification to higher management.

    Create your own Project Life cycle...

    Thursday, 3 June 2010

    What you need to know to start an Online Project Management

    What is online project management?

    It is web based software that lets you manage your projects efficiently online or on the Internet. Gone are the days where you need to install software to each and every computer in your office for your team to have access and work on a project simultaneously with others. The modern technology of the Internet makes it possible for every computer to access the project database remotely without installing individual software.
    How did online project management started?

    Project management has been around since the 1900s when early architects planned on building infrastructures such as roads, bridges, railways and highways. It is a discipline wherein a process takes place that leads to a creation of an end product called a project, something that has never been created before or is revision of what has been created previously.

    How did online project management evolved?

    With the advancement in technology nowadays we are equipped with more ways to become efficient. Technology has paved way for better communication which is vital to every project management. Teams can now collaborate with each other without having to be present in one room. Through communication technology, we can conduct meetings remotely, send emails across the globe, do video and chat conferencing and many more which results to a more efficient way to manage people, time and resources. Businesses can cut costs for travel if meetings can be done remotely through video conferencing connecting project holders, clients and suppliers from different parts of the world in one virtual conference room where the project manager can present and discuss the project’s progress.

    How to start online project management?

    Online project management is available if different types. Some are designed with unique capabilities that are accustomed to the type of your project. The project manager can best choose what will fit and work for his project. You need to be able to have a reliable server since your work will mainly be connected to the Internet. A good and reliable server system is needed to ensure you don’t lose data and a back up system will be in place in case of a system crash or Internet connection loss.

    After choosing the project software management that suits your needs you are set to go to a high tech way of managing and overseeing your project remotely. The common misconception of a lot of people is that project management software is too complicated to use so they just revert back to the traditional way of project management. What they don’t realize is that this project management software is actually user friendly. Its interface is created to adapt to those individuals who are not internet or computer savvy. Since the users will not always be computer technicians but other professionals in line with the project, complex software will need to be the least of their worries.

    Effective project management can be achieved remotely using online project management software.  The benefits of remotely managing, tracking and planning for your project will surely help your project become a success.

    Wednesday, 2 June 2010

    How to Deliver Projects On Time

    As a Project Manager, you are always pushed to deliver your projects on time. Not a day goes by that you don't worry about whether you are on, behind or ahead of schedule.

    To help you to boost your chances of success, we've described here...

    How to Deliver Projects On Time

    On a project, it is easy to get bogged down with the details, and forget about the "helicopter view". Other than completing Project Status Reports at the end of each reporting period, many Project Managers adopt the approach that their own knowledge and experience alone will ensure that the project delivers on time.

    But the reality is that all project managers need to complete some basic steps throughout the project, to make sure that it is "on track", otherwise it is easy for a project to go off the rails.

    So what are the steps that a Project Manager needs to complete to make sure that the project is delivered on time? We have listed them for you here...

    Step 1: Plan to succeed
    There is an old project saying: "Plan not to fail, don't fail to plan". By creating a detailed Project Plan with fixed delivery milestones that your customer agree with, you will gain a firm basis for measuring the progress of the project.

    Make sure that your plan includes delivery milestones every month where possible and that the Work Breakdown Structure is detailed enough to show all of the critical tasks that must be completed. Non-critical tasks can be re-scheduled later, but tasks which are on the critical path must be completed by the due dates specified.

    Step 2: Clock the time spent
    Almost every Project Manager these days has implemented Timesheets for tracking time. But how many actually record that time in a Time Sheet Register and update the Project Plan with the time spent per project task?

    By doing this, you can allocate a set amount of time and effort to complete every task on the Project Plan, and easily identify when you are late. If staff spend more time than that allocated and the task is still not complete, then you will need to investigate why this has occurred and resolve the problems identified. This process is called the Time Management Process and it ensures that staff complete tasks where possible, in the timeframe allocated to them.

    Step 3: Create a helicopter view
    It is harder than it looks. To accurately monitor and report on the project at a helicopter level, you need a crystal clear picture of the project delivery against a schedule.

    You need to know for every task in your project plan, whether it is under / on / over schedule and what the overall impact on the project is. You also need to have identified the critical path and determined whether the tasks on this path are on track.

    Only with this detailed knowledge can you gain a sufficient "helicopter view" to be able to report accurately to your Project Board or Sponsor. Remember, by keeping your sponsor accurately informed of the project progress, you will ensure their full support.

    Step 4: Going "Belly Up"
    So you have done all this but your project is going "belly up" (i.e. slipping). What then? Well the first step is to investigate the reasons why. It may be that the scope of the project has grown from that originally agreed, or you have encountered complexities that were not identified when you started, or that the plan was too aggressive in the first place.

    Regardless, you need to 1) Stop 2) Investigate 3) Resolve 4) Report. To resolve the problem, you may need to formally redefine the scope of the project, hire additional resources to help out, or agree with the customer on a new delivery timeframe. You will also need to update the Project Plan with any additional tasks required to fix the problems, and then you will need to report on the new status to your Sponsor.

    Step 5: Getting the right mix
    Almost every project team will encounter unforeseen changes, risks and issues. Your level of success will depend on how you manage these when they arise. By implementing these project processes below, you can ensure that your mix of changes, risks and issues are easily manageable:


    Change Management Process
    Risk Management Process
    Issue Management Process

    To help you deliver projects on time and keep your Project Sponsor happy, use these two great project management solutions now...

    Project Management Templates
    Project Management Methodology

    Turning around Failing Projects

    Most Project Managers have been there. You're assigned a project that's going off the rails and you're expected to turn it around. Where do you start? Why is it failing? What should you do to get it back on track?

    People who exceed in these roles are called "turn-around specialists" and it's a discipline of its own. Yet Project Managers are often asked to do it. So we thought we'd offer some tips and advice here, on:


    Turning around Failing Projects

    Great– you've been assigned to a new project, but things are already going crazy. Your team are dissatisfied, your deliverables are late and your budget has already been exceeded. Your Project Sponsor is unhappy and no-one really knows who the customer is. Where do you start?

    Confirmation

    The first thing to do is to find the documented vision for the project, go to the Sponsor and confirm that it's still accurate. If there is no vision, then you need to create one pretty darned quickly. Identify the key project stakeholders and get them to agree on exactly what the project must achieve, by when and whom for. Only with a solid vision will you have a clear stake in the ground from which to move forward.

    Review

    Next, you need to find out what's going on. Why are the team unhappy? Why is everything late etc. Identify the top 10 things that need to be fixed to get the project back on track. Don't look back, only look forward.

    Don't do a post mortem. Instead make it a short, sharp review that identifies the key issues affecting the project. Involve your team as much as possible, as you need their buy-in.

    Quick Wins

    You need to build confidence with your Sponsor and more importantly, your team. Choose a couple of issues that you know you can solve immediately, and once solved, communicate it to your team.

    Plan of Attack

    Only now, will you have a good feel for the project issues and what it will take to resolve them. You can now create a plan of attack. Identify the actions to be taken by all of the team, to deliver the project vision successfully. We say "all" of the team, as you need to gain the buy-in of your entire team to get the show on the road.

    Then take your plan to your Sponsor and get their support. Don't be afraid to ask for more money, time or resource as this is the time to ask for it. If you ask now while you're fresh in the role, it won't reflect on you. Don't wait until you're near the end of the project before you ask.

    Rally

    With your Project Sponsors support, get the project team together, for a single communications event. Tell them what you've found, what needs to be fixed and how you plan to do it. Tell them about the quick wins that have already been made and how you know that if everyone focuses on the plan ahead, you can deliver successfully.

    Milestones

    Set clear milestones that everyone understands. Put the milestones and plan of attack on a wall chart to make them visible. Then meet regularly to discuss their progress.

    Love, Hugs and Tears

    Then love your high performing staff, hug your underperformers who show promise, and shed no tears at having to change staff that show no signs of buying in to your action plan. It's onwards and upwards!

    Tuesday, 1 June 2010

    How to Set Project Goals and Achieve Them


    If you want to learn how to set Project Goals and achieve them, then read this interesting post...

    How to Set Project Goals and Achieve Them


    As a Project Manager, you have too much work to do and not enough time to do it in. With so much going on, you need to be really focused if you want to achieve success. The best way to get focused is to set 3 Project Goals and then work hard to achieve them. Here's how to do it...




    Step 1: Identify what's important
    In projects, everything is priority . So you need to take time to sit down with your Project Sponsor and identify what it is that is really important to achieve. Ask them this question: "If there were 3 critical things that the project had to deliver, then what would they be?"
    The 3 things might be "delivering on time, under budget and to specification". Or it might be producing 3 key deliverables. Or they might be 3 major business benefits.
    Step 2: Set them as goals
    Then take these 3 important "things" and turn them into project goals. Remember to make your goals SMART - Specific, Measurable, Attainable, Realistic and Timely.
    So why only have 3 goals? It's simple. With everything that goes on in your project, you will only ever remember 3 things long term. That's also why you need to keep them short and simple. If you set 5 or more goals, then you'll probably forget them within a week, making them harder to achieve.
    Step 3: Communicate them
    Print out your new goals and put them on your wall behind by your desk. Then take your team out for lunch and tell them what the 3 goals are and why they are important to achieve.
    Then tell your other stakeholders about them, including any contractors, suppliers and business representatives that may be involved with the project. Make sure everyone in the project knows what has to be done and by when. Then you're all "on the same page" and working towards the same goal posts.
    Step 4: Set an Action Plan
    Having the goals in front of you every day will help, but you need to get serious and create an action plan to achieve them. Revisit your Project Plan and identify all of the tasks that will specifically help you achieve your 3 goals. These tasks are now the "high priority" tasks for the project and together, they form your "Action Plan".
    Assign your best resource to these high priority tasks and make sure they have everything they need to achieve them.
    Step 5: Keep an Eye on Progress
    As a Project Manager, you can't watch everything. So just focus on the high priority tasks in your plan. Track their progress daily. Resolve any issues that arise with them, as quickly as possible. Personally oversee them if you need to. If they slip, then take quick action to bring them back on track. Do everything in your power, to make sure that these high priority tasks are completed on time, so that you can achieve your 3 goals and lead your project to successes.

    Monday, 31 May 2010

    Monitor and Control Your Projects (Part 3)

    There are 3 critical areas that many project managers overlook when monitoring and controlling projects, and they are often the root cause of project failure. These 3 areas are the management of; suppliers, procurement and communications. To help you to monitor and control each area efficiently, we've described each in further detail below...


    Monitor and Control Your Projects (Part 3)

    Having previously covered the management of time, cost, quality, change, risk and issues - the final step in the "Monitor and Control" newsletter series is the management of suppliers, procurement and communications.

    If you can monitor and control all of these aspects smoothly and efficiently, then you will have a great chance of delivering your project successfully. So let's tackle the last 3 remaining areas now...

    Managing Suppliers

    Always make sure you appoint suppliers through a formal process. Even if you're appointing suppliers you know and have worked with for some time, always create a statement of work which defines the exact scope of work that you wish them to perform.

    Next create a formal detailed supplier contract for the scope of work to be completed. In this contract, define the work to be completed, the responsibilities of both parties, the performance criteria and terms and conditions for the relationship. Then if things go sour, you have something to fall back on.

    In your contract, have milestones which specify what it is that you expect them to have delivered and by when. Then at each milestone date, complete a formal review of deliverables completed to date, vs. the deliverables specified in the contract. If things change during the project, then amend the contract accordingly. The contract should always represent the nature of the agreement and never become "out dated".

    You can then closely monitor and control your suppliers performance.

    Control Procurement

    As well as managing your suppliers overall performance, you also need to monitor and control the procurement of goods and services from those suppliers.

    Controlling procurement is all about reviewing and accepting goods and services once they have been delivered by your supplier. You need to implement a Procurement Management Process which enables your team to take ownership of the item being delivered, review it against pre-defined criteria and approve payment for it, based on your supplier contract.

    Tip: Always make sure that you issue Purchase Orders for products you require from suppliers. Create a detailed description of the product you require on the Purchase Order, so that you have something to measure against when it arrives.

    Perform Communications

    Communication is King! As part of the "monitor and control" phase in a project, you'll need to keep a constant eye on the communications that are taking place.

    You should always have a formal Communications Plan in place so that key messages are communicated to the right people at the right time. You can then monitor and control your project communications by making sure that the activities on your communications plan are completed at the right time, and in the right manner.

    Make sure you have a feedback process so that if the wrong messages are received by staff, suppliers or stakeholders, then you'll be immediately informed and can take action to resolve it.

    So that's in. In these last 3 posts, we've explained how to monitor and control your project by managing:


    • Time, Cost and Quality

    • Change, Risks, and Issues

    • Suppliers, Procurement and Communications

    By using these key project management principles, you can deliver projects quickly and efficiently, with less stress and effort than before.

    Monitor and Control Your Projects (Part 2)

    One of the biggest challenges you will face as a Project Manager is "scope creep". That's when during the Execution phase of the project, the planned scope of work changes, often causing delays and expense.

    To avoid this, you need to carefully Monitor and Control your projects, by implementing change, risk and issue processes. Here are some tips on how to do it...


    Monitor and Control Your Projects (Part 2)

    So things aren't going to plan because your customer has changed the scope of the project? Don't worry, this is a normal event for a Project Manager, as many projects are time consuming and while the project has been progressing, the business pressures faced by the customer have changed.

    The art is not in minimizing change, but in managing it properly when it does occur. Here's how to do it...

    Monitor Change

    The most typical cause of a project going off-the-rails is that the scope has grown out of control, by "osmosis". The client has asked for changes, the team have had new ideas and your nice neat set of project tasks now look like spaghetti.

    To succeed, you need to keep tight control of your project scope, by being vigilant about change. Do this by implementing a change management process. As soon as you identify a request for change in your project, document it formally by specifying where the change has come from, why it's needed and its impact on your project objectives.

    And if the change is likely to affect the target end dates, budget or deliverables, then get your sponsor and customers approval before implementing it. Don't be afraid to ask for more time, people or money if you need it, especially if the change was initiated by the customer.

    Never allow change to run your project. Instead, run your project by managing change!

    Control Risks

    As a Project Manager, it's all too easy to roll your sleeves up and get stuck into the project delivery. But when you do this, it's often hard to keep your head above water. You may end up managing at the micro level and high level risks to the project may pass you by.

    It's hard, but try and remain a little divorced from the detailed day-to-day operation of your project where possible. In this way, you can continually assess the overall risk to the project from the outside and pounce on new risks when they appear.

    Also, implement a Risk Management Process to formalize the way that risks are identified, assessed and mitigated. For each risk that appears, quantify its potential impact on the project, then take immediate action to minimize the likelihood of it occurring. Always create contingency plans, so that if the risk does occur, you can go to "plan b" and minimize its effect on the project delivery.

    Resolve Issues

    Resolving issues sounds easy right? The challenge however, is not just in resolving every issue that turns your way, but instead monitoring all of the issues that occur on a project and only resolving issues that are likely to impact on the project outcome. It's very infrequent on a project that you'll have time to resolve every issue that crops up - so be picky.

    To make sure that you resolve issues in a timely manner, you need to put in place an Issue Management Process. This helps you to review all of the issues that crop up, assess their impact, delegate the ones that can be handled by others and resolve those that are critical to the project.

    And there you have it! By managing change, risks and issues, you'll be able to avoid scope creep and boost your chances of achieving project success!

    Monitor and Control Your Projects (Part 1)

    How should you monitor and control your projects? It's a good question, because everyone does it differently. We believe that the processes you use to monitor and control projects should be the same, regardless of the size and type of project you undertake. So read on, to find out how to effectively...


    Monitor and Control Your Projects (Part 1)

    After you've started up and planned your projects, you'll move into the Execution (or "delivery") phase in the project life cycle.

    This is typically the longest phase in the project, as it's in this phase that the physical deliverables are built for the customer. Whether your project is to build a construction complex, computer system or land a space vehicle on mars, you will need to very carefully monitor progress and control delivery. Otherwise, your project could go off the rails.

    So to monitor and control delivery, you need to implement 9 critical project management processes. We'll describe the first 3 processes here, and in the next newsletter we'll cover the remaining 4 critical processes or you.

    Critical Process #1: Time Management


    Every Project Manager knows that the customer expects their project to be delivered "on time". But how many Project Managers actually record every hour spent by staff on the project?

    To ensure on-time delivery, that's what you need to do: implement a time management process. This process will help you to monitor the time spent by all of the members of your team, so that you can control how time is spent.

    It's not just about "having great time management skills" either, it's about putting in place a process for recording time spent by staff by using timesheets and recording that time against the project plan.

    That way, you can create an accurate picture of the current status of the project to determine whether or not it is likely to finish under / on / over the time allotted.

    Critical Process #2: Cost Management


    Few Project Managers can tell you for every day of the project, exactly how much of their budget they have spent to date. The reason is that many of the project costs are often difficult to track, especially when they relate to the use of equipment and consumption of materials.

    But to deliver you project within budget, you need to monitor and control all of the costs that accrue, on a very regular basis. You can do this by implementing a cost management process.

    Cost Management is all about accurately recording project expenses, as they occur. By using Expense Forms and an Expense Register, you can monitor all project costs and control expenditure when unplanned expenses arise. You don't need to be an accountant, you just need to keep an eye on the overall project expenditure on a weekly basis and act quickly when any issues arise.

    Critical Process #3: Quality Management


    It's often said that the hardest thing to monitor is "quality". Most Project Managers find it difficult to determine exactly what the customer expects in terms of deliverable "quality", let alone measure the actual levels of quality achieved. But you must try.

    To do this properly, you need to implement a Quality Management Process. By following this process, you can set quality targets to be achieved and gain agreement from your customer.

    Then you can use Quality Assurance and Quality Control techniques to monitor and control the actual quality of your project deliverables. If your quality levels drop below the targets set, then you can take action to rectify it. By constantly reviewing quality levels and ensuring that they always meet the target, you can feel confident that your customer will sign off your project as complete, once all of the deliverables have been produced.

    And there you have it. By implementing time, cost and quality management, you can take the first steps needed to properly monitor and control your project delivery. ...

    Read More... Monitor and Control Your Projects (Part 2)